Frequently Asked Questions
Do you sell or install firefighting equipment?
No. We are an engineering consultancy only — design, review, documentation and technical coordination. We do not supply, install or maintain equipment.
Do you issue government approvals?
No — approvals are issued by the relevant authorities. Our role is to prepare the engineering file, support submission and follow up on comments.
Which cities do you serve?
We are based in Al Khobar and serve Dammam, Dhahran, Jubail, Ras Tanura and Al Ahsa, as well as Riyadh.
How is pricing set?
Pricing depends on scope, facility size and required deliverables. Once we have the basic information we send a clear technical and financial proposal.
What licenses and certifications does ENSCO hold?
ENSCO holds an Activity License from the General Directorate of Civil Defense (No. 100001560) and ISO 9001:2015, ISO 14001:2015, and ISO 45001:2018 certifications issued by PDCA Certification, available to view on the About page.
Do you supply, install or maintain fire systems?
No. ENSCO is an engineering consultancy. Our role is design, review, documentation and technical coordination within the agreed scope; supply, installation and maintenance are carried out by a specialist contractor.
What standards do you work to?
We work to the Saudi Building Code (SBC 801) and relevant NFPA standards, in addition to project owner requirements where applicable.
How long does design take?
It depends on the facility size, complexity and how complete the architectural drawings are. We set out a clear timeline in the technical and financial proposal after reviewing the information.
Does the design include submission to Civil Defense?
Yes. The scope includes preparing, submitting, and following up on the file until approval is issued. The final approval decision rests with Civil Defense.
Can you design for an existing facility?
Yes. We start with a site visit and assessment of current conditions, then propose the design or required modifications.
Do you guarantee license renewal?
No consultancy can guarantee renewal; the decision rests with Civil Defense. What we commit to is an accurate facility assessment, a sound technical report, and follow-up on observations until closed.
Do you carry out the required repairs?
No. We identify the observations and specify what is needed to close them; execution is handled by a specialized contractor.
Do I need a Salamah account?
Yes. The renewal application is submitted through the facility's Salamah account; we issue the technical report and support you through submission and follow-up.
Does the service cover every issuance and renewal case?
The right support is defined after reviewing the facility's status and the type of application; we set out the scope in the technical and financial proposal.
Do you need our Salamah account password?
No. We never ask for passwords or login codes; the application stays in the facility's own account, and we provide the report and documents needed.
What file format should I send?
PDF and DWG are both fine. Please include calculations and specifications with the drawings.
Do you stamp drawings straight away?
Stamping happens after engineering review and closure of comments, and only within our licence authority.
Do you work with subcontractors?
Yes — we work with MEP subcontractors, main contractors and consultants.
Is ENSCO an Aramco-approved vendor?
We provide technical support to contractors on file compliance. We do not present ourselves as an Aramco-approved vendor or partner.
Can we start with a quick review of our current file?
Yes — a gap assessment is the usual starting point to identify what the file is missing.
Who delivers the aviation services?
They are delivered in partnership with Aero Support Group FZCO: its specialist auditors and consultants handle the technical work, while ENSCO manages the relationship, contracting, and on-ground coordination in the Kingdom.
Let's start by reviewing your project requirements
Send us a short project description on WhatsApp, or request a quote and an engineer will contact you to define the scope.
